Reynolds reynolds
 
reynolds
Home Reynolds About us Reynolds Services Reynolds Projects Reynolds News Reynolds Careers Reynolds Contact us
reynolds
 
 
St. Clair Area School District
Abington Heights School District
Brookside Montessori School
Phoenixville Area School District
Golds Gym Harrisburg
Shippensburg Area School District
Shikellamy School District
Schuylkill Intermediate Unit 29
Pottstown School District
Our Lady of Victory
Conestoga View
Riverfront Office Center
 
 
 
 
Projects: St. Clair Area School District | Abington Heights School District | Brookside Montessori School | Phoenixville Area School District | Golds Gym Harrisburg | Shippensburg Area School District | Shikellamy School District | Schuylkill Intermediate Unit 29 | Pottstown School District | Our Lady of Victory | Conestoga View | Riverfront Office Center
 
GOLDS GYM HARRISBURG
Camp Hill,PA
 

PROJECT OVERVIEW
Reynolds Energy Services was awarded a contract to provide performance contracting services at Gold’s Gym in Camp Hill, PA. The project included several energy efficiency measures (ECM) including: retrofitting the existing lighting with energy efficient swiss replica watches lamps and ballasts.
 
OWNER
Mr. Thomas Potter
3401 Hartzdale Drive
Camp Hill, PA 17011
717-303-2070
 
PROJECT SCOPE
  • Replacing lighting fixtures in locker rooms, kids club, offices with new T-8, 28-watt XP SS lamps and high efficiency T-8 electronic low power ballasts.
  • Replacing fluorescent lamp fixtures in café, employee areas and private rooms with a new reflector and two, T-8, 17-watt XP lamps and high efficiency T-8 electronic ballasts – eliminating costly U-tube lamps while maintaining recommended light levels.
  • Replacing the gym’s HID, 400-watt metal halide fixtures with new T-8 fluorescent, six lamp,fake rolex watches highbay fixtures - reducing fixture wattage by 30%.
  • Installing occupancy sensors to shut off lights when the space remains unoccupied for  a pre-set amount of time.
ENERGY EFFICIENCY MEASURES

    * Lighting Controls
    * Building Envelope
    * Water Conservation

CONSTRUCTION COMPLETION
2009

PROJECT COST
$37,400

ANNUAL PROJECT SAVINGS
$16,245

TYPE OF CONTRACT
Guaranteed Savings 15 year term

STATUS OF SAVINGS
Savings to date have been achieved


 
 
Copyright © Reynolds Energy Services. All Rights Reserved 2010.
By WebpageFX - Internet Marketing Services